The John of Gaunt School

Trowbridge, England

The Project

The John of Gaunt School required the provision of additional classroom space while maintaining full operational continuity during term time.

The project scope comprised the demolition of existing single-storey structures, installation of foundations and provision of below-ground service connections. Works also included the implementation of a stormwater attenuation system to manage surface water discharge and the construction of new hard landscaping and pedestrian pathways to integrate the new facilities within the existing school layout.